PM-KUSUM Solar Scheme

Empowering Farmers & Landowners with PM-KUSUM Solar.

Turnkey EPC execution for PM-KUSUM Component-A (500 kW to 2 MW decentralized solar plants), Component-B (standalone solar pumps), and Component-C (feeder solarization) across Telangana with guaranteed 25-year DISCOM revenue.

25-Yr PPA Revenue Guarantee
TGREDCO & DISCOM Approved
PM-KUSUM Solar Scheme Ground Mounted Plant Installation in Telangana
0.5 - 2 MW Component-A EPC
25-Yr PPA Fixed Tariff Income

Why Choose the PM-KUSUM Scheme?

Guaranteed Monthly Income

Earn steady monthly revenue for 25 years by selling generated clean electricity directly to DISCOM under a state-backed PPA.

Monetize Barren Farmland

Transform dry, uncultivated, or barren agricultural land within 5 km of rural substations into profitable solar farms.

Up to 60-90% Pump Subsidies

Avail extensive central and state government financial assistance under Component B & C for solar water pump systems.

Turnkey HT Grid Evacuation

Complete execution of 11kV/33kV overhead lines, step-up transformers, ABT metering, and CEIG safety inspection clearances.

Daytime Irrigation Power

Eliminate dependence on erratic nighttime grid power and eliminate expensive diesel fuel consumption for irrigation.

Agri-Voltaic Farming

Dual land use: generate solar energy overhead while cultivating shade-loving crops, pulses, and vegetables underneath.

What is the PM-KUSUM Scheme?

The PM-KUSUM (Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan) is the Ministry of New and Renewable Energy’s (MNRE) landmark scheme designed to provide energy and water security to farmers while generating steady revenue from clean power.

The scheme is divided into three key components:

  • Component-A: Setting up 500 kW to 2 MW decentralized ground-mounted grid-connected solar power plants on barren/agricultural land within 5 km of a 33/11 kV substation.
  • Component-B: Installation of standalone individual solar agricultural pumps up to 7.5 HP with massive subsidies.
  • Component-C: Solarization of existing grid-connected agriculture pumps and dedicated agricultural feeder solarization.

Sravanthi Solar offers end-to-end turnkey EPC services in Telangana—from initial substation distance feasibility, TGREDCO registration, DISCOM connectivity sanctions, and CEIG approvals to transformer erection, grid synchronization, and 25-year O&M.

KUSUM Solar Farm (0.5-2MW) Utility Inverters 11kV / 33kV Transformer DISCOM Substation 25-Year PPA Revenue & ABT Smart Metering

PM-KUSUM Scheme Components

Choose the right government-supported solar model for your agricultural land or irrigation needs.

Component A: Solar Power Plants

0.5 MW to 2 MW grid-connected ground-mount solar plants installed by farmers or developers within 5 km of a 33/11kV substation. Power is sold to DISCOM under a 25-year fixed tariff PPA.

Component B: Standalone Solar Pumps

Installation of individual solar water pumping systems up to 7.5 HP for farmers without grid electricity, with up to 60-90% subsidy support from central and state governments.

Component C: Feeder Solarization

Solarization of dedicated agricultural distribution feeders to supply free, reliable daytime power to all tube wells on the network, selling surplus energy back to DISCOM.

PM-KUSUM Project EPC Lifecycle

Step-by-step guidance from site survey and TGREDCO sanction to grid synchronization.

1. Feasibility & Survey

Verify that farmland is within 5 km of a 33/11kV substation with spare capacity, plus soil & shadow testing.

2. Application & PPA

TGREDCO registration, DISCOM technical sanction, PPA signing, and CEIG electrical safety approval.

3. Civil & Structure

Land grading, foundation piling, hot-dip galvanized mounting structures, and Tier-1 bifacial panel installation.

4. Inverter & Substation

Erection of central inverter stations, 11kV/33kV step-up transformer, switchyard, and overhead HT power line.

5. Grid Sync & PPA Start

ABT bidirectional metering, joint inspection with DISCOM, grid synchronization, and start of revenue generation.

Main System Components

MNRE ALMM-approved, tier-1 rated components engineered for 25+ years of trouble-free operation.

HT Step-Up Power Transformer Substation for PM-KUSUM Solar Grid Evacuation

HT Step-Up Transformer

High-efficiency step-up power transformers (0.8kV to 11kV / 33kV) with safety protection relays and oil cooling systems.

Multi-MPPT Utility Central String Inverter Station for PM-KUSUM Plant

Utility Inverter Stations

Multi-MPPT central and high-capacity string inverters with 99%+ conversion efficiency and active anti-islanding control.

Hot Dip Galvanized Heavy-Duty Steel Solar Mounting Structures for Farmland

Heavy-Duty Mounting Structures

Hot-dip galvanized (HDG) steel ground mounting frames designed to withstand cyclone wind speeds exceeding 160 km/h.

11kV and 33kV Dedicated Power Transmission Lines for Substation Evacuation

HT Transmission & Evacuation

Dedicated 11kV/33kV overhead transmission lines connecting the solar power plant switchyard directly to the DISCOM substation.

IoT Cloud SCADA System and Weather Monitoring Telemetry Station for Solar Plants

IoT SCADA & Weather Station

Cloud-connected telemetry monitoring solar irradiance, wind speed, module temperatures, string currents, and daily PR performance.

Outdoor Electrical Switchyard with Vacuum Circuit Breaker and Lightning Protection

Switchyard & Lightning Grid

Complete outdoor electrical switchyard equipped with vacuum circuit breakers (VCB), lightning arrestor towers, and chemical earthing.

Key Technical Features

Bifacial PV Modules

Captures sunlight from both sides, increasing overall field energy yield by up to 15-20%.

CEIG Safety Certified

Rigorous electrical safety engineering compliant with Central Electricity Authority (CEA) standards.

Remote Telemetry

24/7 central control room monitoring with automatic alert notifications for maximum uptime.

160+ km/h Wind Rating

Engineered structural foundations and rammed piles built to resist severe monsoon storms.

Lowest Levelized LCOE

Optimized Balance of System (BOS) engineering delivering industry-leading cost per kilowatt-hour.

Tier-1 ALMM Modules

We only use MNRE ALMM-approved Tier-1 solar modules with 25-year linear performance warranty.

PM-KUSUM Solar Power Plant High Yield Investment

High-Yield Farmland Income & ROI

PM-KUSUM offers guaranteed long-term revenue with state government backing, converting underutilized land into an inflation-proof cash-generating asset.

0

Yrs

Fixed PPA Contract

0

-4 Yrs

Capital Payback

0

+ Lakh

Units / MW / Year

0

%

Tax Depreciation

Why Choose Sravanthi Solar for PM-KUSUM?

Telangana's trusted renewable energy contractor with over a decade of proven execution.

TGREDCO Approved

Official channel partner recognized by Telangana State Renewable Energy Development Corporation.

Complete Statutory Liaison

We handle all DISCOM HT approvals, CEIG inspection clearances, and revenue metering formalities.

In-House EPC Teams

Dedicated civil, structural, and high-voltage electrical engineers ensuring flawless execution.

Rapid Commissioning

Fast-track project execution model delivering fully operational MW plants in 60-90 days.

Tier-1 Quality Only

Strict procurement of MNRE-approved solar panels, Schneider/ABB/SMA inverters, and Class-A transformers.

Turnkey O&M Support

Comprehensive operation, preventive maintenance, module robotic cleaning, and SCADA monitoring.

PM-KUSUM Expertise

Specialized advisory and application filing for farmers, land aggregators, and rural developers.

Project Gallery

PM-KUSUM decentralized solar projects and agricultural installations across Telangana.

PM-KUSUM Component A 1MW Decentralized Agricultural Solar Power Project in Telangana

PM-KUSUM Solar Farms

Turnkey Ground Mounted Solar Power Plant in Telangana

Decentralized Rural Solar Parks

Industrial Captive Solar Power Project in Telangana

Feeder-Level Agricultural Solar Plants

Frequently Asked Questions

What is PM-KUSUM Scheme and who is eligible?

The PM-KUSUM (Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan) scheme is a flagship government initiative enabling farmers, farmer producer organizations (FPOs), cooperatives, and developers to set up grid-connected solar power plants (0.5 to 2 MW) on barren, fallow, or pasture land within 5 km of a 33/11kV DISCOM substation, and install subsidized solar agricultural pumps.

How much land is required for a 1 MW PM-KUSUM Solar Power Plant?

A 1 MW decentralized ground-mounted solar power plant under PM-KUSUM typically requires approximately 3.5 to 4 acres of shadow-free land located within 5 kilometers of a rural 33/11kV DISCOM substation.

How does a farmer earn income under PM-KUSUM Component-A?

Under Component-A, the entire generated electricity is purchased by the state power distribution company (DISCOM) at a guaranteed pre-fixed feed-in tariff under a 25-year Power Purchase Agreement (PPA). Alternatively, farmers can lease their barren land to solar developers for guaranteed annual lease rental payments.

Can a farmer cultivate crops under solar panel structures?

Yes! Through elevated agri-voltaic mounting structures designed by Sravanthi Solar, shade-tolerant crops like pulses, vegetables, turmeric, and fodder can be cultivated beneath and between the solar panel rows while the plant generates power overhead.

Does Sravanthi Solar handle government liaison and PPA agreements?

Yes. Sravanthi Solar is an approved TGREDCO channel partner and manages the complete lifecycle: feasibility assessment, DISCOM connectivity sanction, CEIG safety inspections, 11kV/33kV transmission line installation, and commissioning.